Town hall · 18e
Mairie du 18e
Actually paid
812k €
Ordered (contract ceilings)
822k €
Works paid for, year by year812 k €
Mairie du 18ème arrondissement - Travaux de restructuration2023560 k €Mairie du 18ème arrondissement - Travaux dans le cadre du Schéma fonctionel et immobilier,2023125 k €
Mairie du 18e arrondissement - Schéma fonctionel et immobilier2024127 k €Contracts signed for this place822 k €
Aménagement du Péristyle Mairie du 18e ArrondissementEDILE CONSTRUCTION · 2018165 k €Marché d’enlèvement de 2 classeurs rotatifs et pour la fourniture, l’installation, la mise en service, la maintenance de 2 nouveaux classeurs rotatifs destinés à la mairie du 18e arrondissement.KARDEX FRANCE · 2025135 k €Modernisation du SSI Mairie du 18ESOC ETUDES REALIS INSTALLATIONS SEC · 2018107 k €Show the 10 other contracts
MS Divers TRX Génie Climatique Mairie du 18E PL J.joffrinCELSIO · 201876 k €Repas Simple et Repas Elabore pour la Mairie du 18eSOCIETE SEILLER · 201850 k €Buffet Simple et Buffet Elabore pour la Mairie du 18ELA RESIDENCE SOCIALE · 201850 k €Modernisation du Tgbt Mairie du 18EERI · 201448 k €Modernisation des Sanitaires Publics Mairie du 18EALB-BAT GROUPE · 201746 k €Travaux de modernisation des anciens bureaux de l'antenne logement (DLH) à la Mairie du 18e Arrondissement-1 place Jules Juffrin 75018 ParisERI · 202642 k €Création D'une Salle de Repos à la Mairie du 18EALB-BAT GROUPE · 201639 k €Modernisation du Local Pressoir de la Mairie du 18E.SOC INDUSTR RATIONALIS ENTRET · 201339 k €Conception et organisation de la cérémonie des voeux de la Mairie du 18eTWOBEVENTS TRAVEL SAS · 202420 k €Mission de BET pour le renforcement du plancher de l'état civil dans le cadre du remplacement des classeurs rotatifs de la Mairie du 18e arrondissement-1 Place Jules Joffrin 75018 ParisPRATEC · 20244 k €Maximum amount set in the contract, not the final spend: what was actually paid on each contract is not published by the City. Each line links to the contract record.
Key moments
OCTOBER 1996A neighborhood police command post, jointly funded with the StateThe Council approved the principle of creating a neighborhood police command post inside the town hall and authorized a project-management delegation agreement with the State (Ministry of the Interior).
SEPTEMBER 2001Launch of the major accessibility project, permits includedThe Council approved the principle of improving public reception and accessibility, awarded project management to the B+M Architecture firm, and authorized filing the demolition and construction permits.
SEPTEMBER 2004Cost and timeline of the restructuring works revisedThe Council authorized amendment no. 1 to the works contract with SNC Sachet et Brulet, raising this contract to €654,353.79 including tax and the execution period to 8 months.
SEPTEMBER 2006Fitting out and modernizing the Poulbot roomThe Council approved the principle of fitting-out and modernization works for the Poulbot room, inside the town hall.
See 4 more moments
FEBRUARY 2004Project management adjusted by a second amendmentThe Council authorized amendment no. 2 to the project management contract with B+M Architecture, raising this contract to €187,978.51 including tax.
APRIL 2006Renewing the town hall's fire alarmThe Council approved the principle of replacing the town hall's fire alarm and its control system.
NOVEMBER 2007Rethinking public reception in the lobbyThe Council approved the principle of improving public reception in the town hall's lobby.
FEBRUARY 2009Building security after the Safety Commission's reviewThe Council approved the principle of security works following the Safety Commission's review.
AI reading of 12 documents out of the 246 returned by the search — each line links to its deliberation.
Sources
Conseil de Paris (Débat-Délibs) ↗ · Bulletin municipal officiel (Gallica/BnF) ↗ · CA annexes, Ville de Paris