Bois · 12e
Bois de Vincennes
Actually paid
10.8€M
Ordered (contract ceilings)
3.6€M
Also funded here
Organisations that receive a subsidy for an activity at this place without running it.
CABANES →5 k €Works paid for, year by year10.8 €M
09
10
2 €M11
12
13
14
15
16
17
18
19
20
21
22
23
See the 12 works programmes in detail (2009–2017)
BOIS DE VINCENNES2.8 €MBOIS DE VINCENNES2.3 €MBOIS DE VINCENNES1.6 €MPAGODE DU BOIS DE VINCENNES938 k €BOIS DE VINCENNES567 k €BOIS DE VINCENNES528 k €BOIS DE VINCENNES470 k €BAIGNADE DAUMESNIL - BOIS DE VINCENNES (411 k €BOIS DE VINCENNES411 k €BOIS DE VINCENNES248 k €BOIS DE VINCENNES209 k €PAGODE DU BOIS DE VINCENNES58 k €Payments traced in the City’s published accounts: detailed per works programme until 2017, then only for some large projects from 2019. Each line links to the online accounts.
Contracts signed for this place3.6 €M
Travaux D'aménagement le Bois de Vincennes Paris 12eLES PAVEURS DE MONTROUGE/SETHY · 2018847 k €Bungalows -bois de Vincennes-lot 2COFICIEL SOLUTIONS MODULAIRES · 2015720 k €Terrassement & Depollution Bois de Vincennes lot 4TERIDEAL SEGEX · 2013512 k €Show the 7 other contracts
Entretien des jeunes peuplements forestiers dans le bois de Vincennes (12e).ESPACE DECO · 2025400 k €Restructuration Locaux Bûcherons-bois de Vincennes 75012DARRAS ET JOUANIN · 2021391 k €Entretien Forestier dans le Bois de Vincennes lot 2SPORTS ET PAYSAGES · 2021261 k €Restauration Pagode Bois de Vincennes lot 4SERRURERIE MENUISERIE · 2013124 k €Restauration Pagode Bois de Vincennes lot 2 CharpenteSOC COOP PRODUCT CHARPENTIER PARIS · 2014121 k €Prestations de fauchage de prairies et pelouses, de débroussaillage de bords de voies et de taillage de haies pour les bois de Vincennes (12e arrondissement) et Boulogne (16e arrondissement), ainsA.D.N · 2026120 k €Restauration de la Pagode du Bois de Vincennes lot 3UNION TECHNIQUE DU BATIMENT · 201499 k €Maximum amount set in the contract, not the final spend: what was actually paid on each contract is not published by the City. Each line links to the contract record.
Key moments
JUNE 2006The City refuses to cut into the woodland for the motorwayA motion affirmed the City's opposition to a 10.3-hectare reduction of classified woodland for the doubling of the A4/A86 motorways.
JULY 2007The Chalet's fee quadruples to €627,750The DF 52 agreement raised the annual fee for the Chalet de la Porte Jaune to €627,750; a motion called for the cycling redevelopment of the site.
NOVEMBER 2018Regulations finally specific to the two boisThe Council was consulted on a set of regulations dedicated to the Bois de Boulogne and Bois de Vincennes, until then attached to the parks-and-gardens regulations.
DECEMBER 2019The renovated cycling loop takes the name of PoulidorThe Polygone cycling loop, redeveloped in summer 2019 with a new surface, received a favorable opinion to be named Raymond-Poulidor.
MARCH 2022The felling of 200 trees sparks controversyResponding to a question from the opposition about the felling of 200 trees for a reforestation zone, the deputy mayor cited the tree management plan and public safety.
MAY 2024An evaluation mission delivers 68 recommendationsThe Council examined the report of the fact-finding and evaluation mission on the two bois (68 recommendations); the related Les Républicains motion was withdrawn.
See 2 more moments
MAY 2010Five lanes given back to pedestrians and cyclistsA motion called for implementing, before summer 2010, the five green ways classified by orders of 2007 and 2008.
JULY 2021A hedgehog sanctuary opens in the woodlandA precarious occupancy agreement with the association Erinaceus was to allow the opening of a hedgehog care sanctuary at the heart of the woodland.
AI reading of 44 documents out of the 937 returned by the search — each line links to its deliberation.
Sources
Conseil de Paris (Débat-Délibs) ↗ · Bulletin municipal officiel (Gallica/BnF) ↗ · CA annexes, Ville de Paris
Same kind




