Pontoise Swimming Pool - Pool renovation
Place · concernsPiscine PontoiseSwimming poolMajor projects
Full renovation of the historic Pontoise swimming pool.
The project renovates the entire building, including pools and changing rooms. The works modernise the installations while preserving the iconic site's character.
Voted budget
488k €
Fiscal year
2024
District
5th
Chapter
Youth & Sports
Final amount & cost overrun — not publicly available at this stage. Administrative accounts publish the voted budget but not systematically the end-of-project balance or amendments. On our roadmap.
Identified companiesauto match ⓘ
These public contracts appear to contribute to this project. This match is automatic and may contain errors — always check the contract object.
LEFEVRE SAS2.7 €M
Piscine Pontoise Rénovation Acces et Bassin
Confirmed· 2022
LEFEVRE SAS2.1 €M
Piscine Pontoise Maconnerie Demolition Etancheite lot 1
Confirmed· 2021
EIFFAGE METAL1.8 €M
Rénovation Charpente Verriere Piscine Pontoise lot 2
Confirmed· 2021
LEFEVRE SAS593 k €
Travaux Réparation Béton du Bassin/plages Piscine Pontoise
Confirmed· 2022
RERUM ARCHITECTES59 k €
Installation d'un ascenseur et mise aux normes d'accessibilité de l'école élémentaire Pontoise (5e).
Confirmed· 2024· 2 bids received· Maitrise d'œuvre· Architecture / ingénierie· Paris
Location
19 rue de Pontoise · View on OpenStreetMap ↗
Source
- CA appendix 2024
- Source PDF · page 12 ↗
- Internal ID
- 2024_05_12_016
- Extraction confidence
- 70 %
Other swimming pool projects · 2024
