Tino Rossi Garden - Partial floor refurbishment
Green spaceOther
Repair of part of the floor surfaces in Tino Rossi Garden.
Renovation of walkways and walking surfaces. The aim is to replace damaged sections to ensure smooth, safe circulation.
Voted budget
51k €
Fiscal year
2022
District
5th
Chapter
Final amount & cost overrun — not publicly available at this stage. Administrative accounts publish the voted budget but not systematically the end-of-project balance or amendments. On our roadmap.
Identified companiesauto match ⓘ
These public contracts appear to contribute to this project. This match is automatic and may contain errors — always check the contract object.
ILE DE FRANCE REVETEMENT IFR8.5 €M
Fournitures,pose Revets Sols Amortis établissement(s) PE Écoles lot 1
Probable· 2022
STAAT6 €M
Fournitures.pose Revetements Sols Amortiss.paris/boulogne lot 2
Probable· 2022
EZEL1.3 €M
AOO Rénovation Partielle Piscine Georges Vallerey lot 2
Confirmed· 2022
VARIOPOOL B.V.96 k €
Travaux Renovat Partielle MUR Mobile Piscine Vallerey lot 10
Confirmed· 2022
LAMOUREUX ARCHITECTE63 k €
Maîtrise d’œuvre Restructuration Partielle RDC 1-4E Étage Mairie Paris contrôle technique
Confirmed· 2022
Location
Quai Saint-Bernard · View on OpenStreetMap ↗
Source
- CA appendix 2022
- Source PDF · page 12 ↗
- Internal ID
- 2022_05_12_005
- Extraction confidence
- 70 %
Other green space projects · 2022